Built with Grok Bot
Unofficial. This is our own record of using Grok Bot, an AI assistant, as project manager on our self-build. It is not endorsed by, sponsored by or affiliated with xAI or any related company, and nothing here suggests otherwise. No logos are used. Status: draft, not yet published.
The team
| Role | What it does | Example outputs |
|---|---|---|
| 🗂️ Project manager | Programme, packages, scopes, decisions | 12 trade packages, schedule, dashboard |
| 📐 Steel & tender estimator | Measures drawings, prices, compares | Elemental estimate, steel BOM, comparison sheet |
| 🌱 Grants researcher | SEAI/Revenue research and rule changes | Grant mapping, SEAI guide |
| 🤝 Sponsorship lead | Pack, partner categories, posts (drafts only, until approved) | Partners, #TeachGrok |
| ✍️ Site editor | Writes and builds this site, checks sources | This website, the checklist, templates |
We wanted this section to show work, not claims. Each page below shows a real output from our project: what we asked for, what the bot produced, how we checked it, and what we'd change. Project money figures are left out on purpose.
What it did, phase by phase
1. 12 trade packages and quote scopes
Split the build into priceable packages, each with a written scope.
2. The schedule
A phase-by-phase programme with gates and a trade call-up order.
3. Independent elemental tender estimate
Measured the drawings and priced 13 elements, with low/mid/high ranges.
4. Steel bill of materials
41 members taken off the structural drawings, plus 7 questions for the engineer.
5. SEAI grant mapping
Every grant line checked against seai.ie for two routes.
6. Tender comparison template
A line-by-line sheet, set out like the estimate, ready for tenders.
Project dashboard
Programme, gates and open decisions.
"What Grok Bot did this week"
The weekly log template.
Where Grok Bot fell short
The mistakes and limits, written up honestly.
Honest metrics
We'll only fill these in when we can back them up. Until then they stay [TBC].
| Metric | Value | How it will be measured |
|---|---|---|
| Hours of PM/admin work saved | [TBC] | Weekly log time estimates vs. doing it by hand |
| Final cost vs. independent estimate | [TBC] | Signed contract sum and final account vs. estimate (published only with approval) |
| Bids / quotes handled | [TBC] | Count of tenders and trade quotes received and compared |
| SEAI grants secured | [TBC] | Grant amounts actually paid (not maximums) |
| Errors caught before site | [TBC] | Drawing queries raised and confirmed by the engineer |
| Errors the bot made | [TBC] | See Where it fell short |
#TeachGrok on X
We post progress on X as @Teach_Theta with the hashtag #TeachGrok.
Launch thread: renovating and extending an old house on Galway Bay with no construction experience. #TeachGrok
View the launch thread on X →
- All #TeachGrok posts: https://x.com/hashtag/TeachGrok