The house, and the brief
We bought an older detached house on Galway Bay: around 165 m² over two floors, a septic tank, solid-fuel central heating, double-glazed PVC windows, a natural slate roof and a BER of E1. It sits on a good-sized site with a south-facing back garden.
We have no construction background. Our first job was a brief: what do we keep, what do we add, and what matters most.
What we decided:
- Keep and refresh the original house: white render, dark-framed windows, the arched porch.
- Add a two-storey extension: stone at ground floor, dark vertical timber above, big glazing and sliders, and a balcony.
- Join the two with a glass link and a modern stair.
- Go electric: an air-to-water heat pump and solar PV, with underfloor heating in the new part and radiators in the old.
- Project manager wrote the first project brief from the sale listing, the existing survey drawings and the 3D design renders: property facts, design intent, the documents on hand and the open questions.
- It turned that into a self-build plan: what the engineer covers (so we didn't pay twice), what we own as client and PM, and the high-level sequence from design freeze to snagging.
- It listed the jobs to do while the drawings and planning were under way: confirm the Assigned Certifier, site investigation, a septic capacity check, a utilities survey, and early approaches to glazing firms.
What we learned: write the brief before you talk to designers. It made every later conversation (engineer, tender, grants) faster.
Next: Stripping it out ourselves · Useful: Start here
This is our build diary: one real house in Galway. Costs and decisions are ours, not advice or typical prices. See the guides for the general how-to.