Mapping the grants
We mapped every SEAI grant against our plans, from seai.ie, measure by measure. The big lessons:
- The extension doesn't count for fabric grants. Only the original house does (SEAI: windows FAQ).
- The individual route gives us control over our own trades. The One Stop Shop offers more grant lines (floor, ventilation, airtightness, project management) but assigns the contractors (SEAI: OSS).
- Nothing starts before approval. That includes ordering windows.
- Grant rules changed several times in 2026. Our first figures went out of date within weeks.
Full guide: How to get every SEAI grant.
- Grants researcher read every relevant seai.ie page and built a measure-by-measure table of grants for both routes, each line with its source.
- It noticed that our September heat pump figure was already out of date after SEAI's late-September change, and updated the plan.
- It flagged the extension exclusion, the heat-loss test, the whole-wall rule, the 8-month offer window and the tax clearance threshold.
- Points it couldn't confirm (mixing routes, two wall measures) went down as "ask SEAI", not guesses.
Next: Tenders are out
This is our build diary: one real house in Galway. Costs and decisions are ours, not advice or typical prices. See the guides for the general how-to.